Work Plan

DURAWOOD project is organised into the following Work Packages (WP), each of which has its own clearly defined goals and tasks:

WP1:

Stakeholder Targeting and Industrial Specifications. 

D1.1 -Report on industry consultation and System specifications (public part)

WP2:

Laboratory Validation of the plasma technology for improving wettability and waterproofing effects. 

D 2.1 Development plasma reactor(Executive summary)

D2.2. Report on wettability and waterproofing laboratory trials (Executive summary)

WP3:

Microbiological Testing.  

D 3.1 Selection most important destructible moulds (Executive summary)

D 3.2 Inoculated wood samples (Executive summary)

D3.3. Validation of the developed PCR system and results of the Comparative test of DURAWOOD-treated and untreated wood at laboratory level

D3.4. Report of the results of the Long-term field tests of DURAWOOD-treated and untreated (Executive summary)

WP4:

Design and development of an industrial DURAWOOD system. 

D4.1. Report on the construction of a pre-industrial prototype and evaluation of the prototype at laboratory (Executive summary)

WP5:

Technology validation at Industrial Level. 

D5.1. Manual of installation instructions of the DURAWOOD prototype (Executive summary)

D5.2. Report on the industrial results and recommendations for future commercialization (Executive summary)

WP6:

Demonstration. 

D6.1. Demonstration Activities Report

WP7:

Knowledge Management and IPR Protection. 

D 7.1 – IPR Capacity Building Session for SMEs

D7.3. Knowledge Management Report (Executive summary)

WP8:

Use and Dissemination.
D8.2 Draft of Plan for the Use and Dissemination of the Foreground (Executive summary) 

D8.3 Consortium Training Session and On-Line training tool

D8.4 Final Plan for the Use and Dissemination of the Foreground

WP9:

Consortium Management.